Renovation of existing office building main lobby and entryway. The main entry had western sum exposure and was subject to harsh afternoon solar gain. we developed a exterior aluminum screen that helped to shade the interior and provided a covering at the front door.
The interior lobby was all 1980’s type finishes . the client particularly disliked the curved second level balcony. we developed a new modern ascetic by removing the existing handrailing and leveling out the curve. the use of composite metal panels here allowed us to cover over some of the existing building granite and materially connect the new entry.